Adrian Hoad showed his new On30 layout under construction. The layout
is the OZEMITE mine, and when completed will feature real loads. The
loader is showne here and unloading will be by a working tippler.
The signal box contains a tiny camera allowing the operator to
monitor the loading operation from the other end of the layout
Photograph:John Dennis