|
Remains of the buffer stop at the end of the triangle, after many bush fires as wella s white ant attack.
Dean Siding had two sidings, fuel and water supplies, and was controlled by two home signals and two distant danger boards. Dean Siding was named after the engineer in charge of building the line. It was located at the summit of the 1 in 25 grades down onto the valley and the Newnes works.
(Photo by Geoff Murray 2008).
| Previous | Thumbnails | Next |